Xylem Dewatering Solutions Case Study

 
A wastewater treatment plant in a major US city turned to Xylem Dewatering Solutions during a recent expansion and renovation project, which required a temporary bypass system to divert a peak wastewater flow of 128 Million Gallons per Day (MGD) and integrate into an existing SCADA system. Xylem installed an electric bypass system capable of transporting water flow via six 335hp submersible electric pumps on Variable Frequency Drives (VFD) and eight 24 inch flow meters alongside a one megawatt diesel driven generator.
 

Challenges

  • Implement a temporary wastewater bypass system
  • Coordinate control of pumps via individual flow meters
  • Configure redundant HMIs for web based control and data logging
G306 HMI   Modular Controller